Technical & Infrastructure

FACILITIES
DESIGNING
Our drawing office features a latest-generation CAD-CAM tool specially adapted to our requirements. It can be used to directly initiate manufacturing based on a VMF Hydraulics in-house design or on a customer’s drawing.

TECHNICAL FACILITIES
VMF Hydraulics is installed on an 8000m² plot with a covered area of 3800m². The built-on area includes 300m² of offices and two distinct workshops. The first workshop houses all our machine-tools including eleven NC machining centres. The second workshop is a controlled area where inspection and packaging operations are carried out. We also stock over 500 different tools for forming even the most complex cavities.

SURFACE TREATMENT